期刊文献+

汽油调合调度优化 被引量:5

Optimization of gasoline blending and scheduling in refinery complexes
在线阅读 下载PDF
导出
摘要 采用连续时间建模方法,建立了一种新的汽油非线性调合和调度集成优化的混合整数非线性规划(MIN-LP)模型,克服了当前在油品调合调度中采用线性调合模型或者将非线性调合过程和调度分开优化的缺陷。针对建立MINLP模型的特点,将原MINLP问题转化为求解一系列的混合整数线性规划(MILP)模型,避免了直接求解MINLP模型的复杂性。最后以某大型炼油企业为例,验证了模型和算法的实用性。 Gasoline blending and scheduling is the last and important operation in a refinery. It is also the last chance to improve the quality of products and to reduce the production costs. Firstly, a novel mixed integer nonlinear programming (MINLP) formulation based on continuous time representation, is presented in this paper. Gasoline blending and short-term scheduling are integrated in the proposed model to optimize blending and scheduling simultaneously, and a nonlinear blending model is employed to reduce the quality excess of gasoline products. Empirical knowledge and some effective sets are added to the model to reduce the model scale and to improve the solve performance. A novel algorithm for the presented model is proposed. A series of mixed integer linear programming (MILP) model is solved instead of solving the original MINLP problem directly. Finally, a real industrial example, provided by a refinery complex, is used to demonstrate the performance of the presented model and algorithm. The model can get the optimal results in a reasonable time, which is more profitable than the conventional or other methods.
出处 《化工学报》 EI CAS CSCD 北大核心 2007年第1期168-175,共8页 CIESC Journal
基金 国家重点基础研究发展规划项目(G2000026308)~~
关键词 调合 调度 混合整数非线性规划 连续时间 优化 blending scheduling MINLP continuous time optimization
作者简介 联系人:张冰剑(1978-),男,博士研究生。E—mail:bjzhang@scut.edu.cn
  • 相关文献

参考文献15

  • 1Jia Zhenya,Marianthi Ierapetritou.Mixed-integer linear programming model for gasoline blending and distribution scheduling.Ind.Eng.Chem.Res.,2003,42:825-835
  • 2Jia Zhenya,Marianthi Ierapetritou.Effective short-term scheduling of refinery operations based on a continous time fomulation.Comput.Chem.Eng.,2004,28:1001-1019
  • 3Klaus Glismann,Günter Gruhn.Short-term scheduling and recipe optimization of blending processes.Comput.Chem.Eng.2001,25:627-634
  • 4Glismann K,Gruhn G.Short-term planning of blending processes:scheduling and nonlinear optimization of recipes.Chem.Eng.Technol.,2001,24:246-253
  • 5Moro L F L,Zanin A C,Pinto J M.A planning model for refinery diesel production.Comput.Chem.Eng.,1998,22:S1039-1042
  • 6王继东,王万良.基于遗传算法的汽油调和生产优化研究[J].化工自动化及仪表,2005,32(1):6-9. 被引量:18
  • 7陈新志.调合汽油研究法辛烷值模型的建立[J].石油炼制与化工,1997,28(1):52-55. 被引量:23
  • 8刘光涛.汽油调合的STEM方法[J].石油炼制与化工,1997,28(8):51-55. 被引量:5
  • 9Zahed A H,Mullah S A,Bashir M D.Predict octane number for gasoline blends.Hydrocarbon Processing,1993,72(3):21-25
  • 10Xu Yifang.Practical Methods of Optimization in Petrochemical Industry.Dongying:Petroleum University Press,1990

二级参考文献13

  • 1任军,李兵.汽油调合的目标规划方法[J].石油炼制与化工,1994,25(10):24-28. 被引量:4
  • 2Singh A, Forbes J F, Vermeer P J, Woo S S. Model-based Realtime Optimization of Automotive Gasoline Blending Operations [ J ]. Journal of Process Control,2000,10 ( 1 ) :43-58.
  • 3Joly M, Moro L F L, Pinto J M. Planning and Scheduling for Petroleum Refineries Using Mathematical Programming [ J ]. Brazilian Journal of Chemical Engineering,2002,19 (2) :207-228.
  • 4Raman R, Grossmann I E.Comput.Chem.Eng.,1991,15(2):73-84
  • 5Raman R, Grossmann I E.Comput.Chem.Eng.,1992,16(3):155-171
  • 6Papoulias S A,Grossmann I E.comput.Chem.Eng.,1983,7(6):695-706
  • 7Nishio M,Itoh J,Shiroko K,Umeda T.I&EC Proc.Des.Dev.,1980,19:306-312
  • 8Perry R H.Perry's Chemical Engineering's Handbooks.6th ed.New York:McGraw-HillBook Company,1984.3.292-3.299
  • 9Grossmann I E, Daichendt MM.Comput.Chem.Eng.,1996,20(6-7):665-683
  • 10Duran M A,Grossmann I E. Math.Program.,1986,36:307-339

共引文献39

同被引文献71

引证文献5

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部