3SHERBROOKE C C. Metric:a multi echelon technique for recoverable item control[J]. Operations Research, 1968,16 ( 1 ):122 -141.
4ARONIS K P, MAGOU I,DEKKER R, et, al. Inventory control ot spare parts using a Bayesian approach:a case study[J].European Journal of Operational Research, 2004,154(3) : 730-739.
5DYER M E, PRPLL L G. On the validity of marginal analysis for allocating servers in M/M/c queues[J]. Management Science, 1977,23(9) :1019-1022.
6曾晋华,程侃.可靠性数学引论[M].北京:高等教育出版社,2006:182-190.
7DE SMIDT DESTOMBES K S, VAN DER HEIJDEN M C, VAN HARTEN A. On the availability of a k-out-of-N system given limited spares and repair capacity under a condition based maintenance strategy[J]. Reliability Engineering and System Safety,2004,83(3) :287-300.
8KIUREGHIAN A D, DITLEVSEN O D, SONG J. Availability, reliability and downtime of systems with repairable components[J]. Reliability Engineering and System Safety, 2007,92 (2) :231-242.