摘要 以上海市典型排水系统真如的改造规划为例,分析了调蓄池在提高城市雨水系统排涝能力上的作用。利用水力模型估计了不翻排现有管道、不增加现有泵站规模条件下,提高系统局部排水标准所需调蓄容积,以及利用调蓄池进行系统改造在降低工程费用方面的作用。结果表明,调蓄容积在60m3/hm2时,真如局部地区排水标准能从1年一遇提高到3年一遇,且比翻排管道节省造价50%以上。研究成果可为采用调蓄池提高已建排水系统排涝标准提供参考。 Zhenru is chosen as a typical Shanghai drainage system to study the use of detention tank for flooding control in urban areas. Hydraulic model is used to predict required tank volume if current pipe and pumping station size are maintained. The economic advantage is analyzed as well. Result shows that, when using detention tank of 60m^3/hm^2, the key area of Zhenru drainage system can withstand periods of design storm up from 1 year to 3 years, and over 50% construction investment can be saved. The study can provide reference to other drainage system using detention tank for flooding control.
出处 《给水排水》 CSCD 北大核心 2006年第9期34-38,共5页 Water & Wastewater Engineering
关键词 调蓄池 排水能力 排水系统 水力模拟 Detention tank Drainage capacity Drainage system Hydraulic simulation
作者简介 谭琼,通讯处:200092 上海市杨浦区密云路528弄同济西苑研究生公寓5号楼403-3室 电话:(021)65987894 E-mail:tanq20@163.com
  • 相关文献

参考文献4

  • 1Wallingford Software Ltd.InfoWorks CS online help:The United Kingdom,2005
  • 2US EPA.Storm water management model,version 4:User's manual.EPA/600/3-88/001a.October 1992
  • 3Chapman R E.Storage Compensation-WaPUG Usernote 15,Version 2.Oct1996.http://www.wapug.org.uk
  • 4邓培德.城市暴雨的积水计算[J].给水排水,1998,24(7):6-12. 被引量:5

二级参考文献1

  • 1邓培德.雨水沟道容量平衡调节法设计流量的研究[J]土木工程学报,1982(01).

共引文献4

同被引文献100

引证文献18

二级引证文献111

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部