摘要
对双鸭山站影响停时指标的主要因素进行分析,提出采取推行号码制,对入矿车辆实时追踪,加强路矿协作,优化运输组织,提高车站作业计划质量等措施。通过实施内涵扩大再生产的挖潜战略,压缩站停时间,加速车辆周转,提高车站运输能力。
The essay analyzes main factors that affect the standing time index in Shuangya Mountain Station, advances the code systemshall be adopted to realize the real time tracking of enter-in mining cars, moreover, the cooperation of railway and mining shall be strengthened,transportation organization be optimized, and station work and plan quality be improved. The essay also puts forward that through theexploration strategy of enlarging the production scale by improving the utility efficiency of production factors, the station interval is shortened,car turnover accelerated, and traffic capacity of station increased.
出处
《中国铁路》
北大核心
2005年第10期49-51,共3页
China Railway