期刊文献+

信号系统与屏蔽门的接口问题及优化方案 被引量:17

Problems and Optimization of the Closed and Locked Circuit for the Interface Between Signaling System and PSD System
在线阅读 下载PDF
导出
摘要 介绍深圳地铁一期项目中信号系统与屏蔽门之间接口的基本工作原理;分析该接口电路主要存在的问题,原因是原来的接口电路中屏蔽门一侧的回路接触电阻较大且不稳定,从而使得由屏蔽门系统发给信号系统的屏蔽门关闭锁紧信号不够稳定;提出切合实际并稳定有效的屏蔽门关闭锁紧回路接口的优化方案。 The fundamental working principles of the interface between the signaling system and Platform Screen Door (PSD) system in Shenzhen Metro Phase 1 Project are presented and the problems in the circuit of this interface are analyzed. It is concluded that the great and unstable contact resistance result s in the instability of the signal of closed and locked interface circuit to signaling system. The author gives the optimized solution for a practical, stable and reliable interface of PSD closed and locked circuit.
作者 李德堂
出处 《都市快轨交通》 2005年第4期109-110,115,共3页 Urban Rapid Rail Transit
关键词 信号系统 屏蔽门 接口 关闭锁紧回路 优化 屏蔽门系统 接口电路 优化方案 锁紧回路 工作原理 signaling system PSD interface between signaling system and PSD System closed and locked circuit optimization
作者简介 李德堂,男,大学本科,车辆设备部工程师,从事地铁信号系统技术管理工作,lidetang318@tom.com
  • 相关文献

参考文献3

二级参考文献5

共引文献57

同被引文献32

引证文献17

二级引证文献51

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部