期刊文献+

斜拉桥成桥后误差调整的优化方法 被引量:12

Optimization method of error adjustment of cable stayed bridgein finished state
在线阅读 下载PDF
导出
摘要 将斜拉桥成桥后的误差调整问题归结为一个多目标、多约束的优化问题,并采用综合参数法进行求解.该方法的特点是通过凝聚函数将此问题转化为一个可微的单目标、单约束优化问题,在此基础上,采用乘子惩罚函数法进行求解.该优化方法不但适合成桥后的误差调整,同样适合斜拉桥施工过程中的误差调整. The error adjustment of cable-stayed bridge in finished state is considered as a problem of optimization with multi-objective and multi-constraint. Method of synthesized parameter is adopted to solve this question. The character of this method is to switch this question to an optimization of single-objective and single-constraint through aggregate function. The optimization is realized using a technique of multiplier penalty functions. The example proves the method is correct and feasible. This method is not only suit to error adjustment of bridge in finished state, but also suits to that of cable-stayed bridge in construction period.
出处 《哈尔滨工业大学学报》 EI CAS CSCD 北大核心 2005年第7期1016-1018,共3页 Journal of Harbin Institute of Technology
关键词 斜拉桥 误差调整 优化方法 凝聚函数 Error correction Functions Optimization
  • 相关文献

参考文献5

  • 1肖汝诚,项海帆.斜拉桥索力优化及其工程应用[J].计算力学学报,1998,15(1):118-126. 被引量:154
  • 2Saric, Andrija T.; Calovic, Milan S.; Strezoski, Vladimir C. Fuzzy multi - objective algorithm for multiple solution of distribution systems voltage control[ J]. International Journal of Electrical Power and Energy Systems,2003,25(2): 145 - 153.
  • 3陈金旺.[D].大连:大连理工大学,1988.
  • 4张可村.工程优化的算法与分析[M].西安:西安交通大学出版社,1998..
  • 5WANG Pao - Hsii, YANG Chiung - Guei. Parametric studies on cable - stayed bridges [ J ]. Computers and Structures. 1996,60 (2) :243 - 260.

二级参考文献5

共引文献156

同被引文献63

引证文献12

二级引证文献59

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部