预应力混凝土曲线连续梁桥的加固 被引量:11

Strengthening of Prestressed Concrete Continuous Curved Girder Bridge
在线阅读 下载PDF
导出
摘要 黄鹤立交CD2号匝道桥是预应力混凝土曲线梁桥,其在运营的初期出现裂缝,通过荷载试验及设计校核分析了裂缝产生的原因,提出了切实可行的加固方案。加固后的计算与荷载试验表明桥梁能满足使用要求。 The Ramp Bridge CD2~# of Huanghe Interchange is a prestressed concrete continuous curved girder bridge. At the early stage of operation, cracks occurred in the Bridge. The causes of the cracks are analyzed on the basis of load tests and design check, and feasible strengthening schemes are prepared. The further calculations and load tests of the Bridge after strengthening indicate that the Bridge can satisfy the requirements for operation.
出处 《桥梁建设》 EI CSCD 北大核心 2005年第2期77-79,共3页 Bridge Construction
关键词 预应力混凝土桥 曲线梁 裂缝 荷载试验 桥梁加固 prestressed concrete bridge curved girder crack load test bridge strengthening
  • 相关文献

参考文献4

  • 1JTJ021—89.公路桥涵设计通用规范[S].[S].,..
  • 2JTJ023—85.公路钢筋混凝土及预应力混凝土桥涵设计规范[S].[S].,..
  • 3交通部公路局.公路旧桥承载能力鉴定方法(试行)[S].,1988..
  • 4YC4—4/1978.大跨径混凝土桥梁的试验方法[S].[S].,..