深埋大直径无压引水隧洞基于流变的风险分析 被引量:6

Risk analysis of deep-buried free-flow large-diameter tunnel based on surrounding rock rheology
在线阅读 下载PDF
导出
摘要 以南水北调西线工程深埋大直径无压引水隧洞为例,考虑高地应力及锚杆、衬砌等支护的动态作用,推导出隧洞围岩、衬砌应力及位移的表达式.经计算表明,一般在运行 5年后,隧洞衬砌及围岩稳定破坏基于流变的风险达到最大,并随围岩流变的稳定而趋于稳定,隧洞开挖后未及时衬砌的风险明显高于及时衬砌的情况. Taking the deep buried free-flow large-diameter tunnel of the West Route Project of the South-North Water Transfer Project as an example, the expressions of stresses and displacement of the surrounding rock and liner are deduced considering the high-geostresses and the dynamic actions of the anchor rod and liner. Calculation results show that the stability failure risk based on the rheologic values of the tunnel liner and surrounding rock reaches the maximum after five years, and becomes more stable with the rehologic stability of the surrounding rock. The risk of a tunnel without liner in time is much higher than that with liner.
出处 《水利水运工程学报》 CSCD 北大核心 2005年第1期15-22,共8页 Hydro-Science and Engineering
基金 教育部科学技术研究重点项目资助(01099)
关键词 引水隧洞 隧洞衬砌 隧洞开挖 南水北调西线工程 围岩 流变 风险分析 大直径 支护 位移 concrete liner rock rheology deep-buried tunnel risk analysis
  • 相关文献

参考文献9

  • 1杨成永,张弥.铁路明洞结构的可靠性设计方法[J].岩石力学与工程学报,1999,18(1):40-42. 被引量:15
  • 2张弥,杨成永.地下工程喷锚支护系统的不确定性研究[J].西部探矿工程,1996,8(1):5-9. 被引量:13
  • 3李广诚 司富安 李广诚 司富安.南水北调西线工程地质概述[A].李广诚,司富安.南水北调工程地质分析研究论文集[C].北京: 中国水利水电出版社,2002.179-181.
  • 4徐卫亚 杨松林 朱珍德.龙滩水电站地下洞室群围岩流变研究报告[R].南京: 河海大学,2003..
  • 5高广礼 潘伯敏 李广诚 司富安.西线南水北调雅砻江调水线路工程地质条件[A].李广诚, 司富安.南水北调工程地质分析研究论文集[C].北京: 中国水利水电出版社,2002.192-197.
  • 6铁道部建设总局.铁道隧道新奥法指南[Z].北京: 铁道部建设总局,1988..
  • 7刘小兵,韩玉华.喷锚支护参数的优化确定[J].岩石力学与工程学报,1994,13(1):79-89. 被引量:3
  • 8李金都 李广诚 司富安.西线调水通天河歇马坝址及引水线路工程地质条件[A].李广诚, 司富安.南水北调工程地质分析研究论文集[C].北京: 中国水利水电出版社,2002.198-200.
  • 9赵自强 随裕红 李广诚 司富安.南水北调西线工程深埋隧洞岩爆与地应力研究[A].李广诚, 司富安.南水北调工程地质分析研究论文集[C].北京: 中国水利水电出版社,2002.208-210.

二级参考文献19

共引文献29

同被引文献53

引证文献6

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部