摘要
枢纽总图制定的枢纽近、远期发展规划,是枢纽分期建设的重要依据。广州枢纽总图过去曾编制过两次,根据当前形势发展,需再次进行修改补充。为此,对广州枢纽总体布局的演变,包括编组站、客运站和货运站的分工及规模、区间及进出站线路疏解等主要问题进行了评述,同时对进一步做好枢纽总体规划提出建议,以供总图研究工作参考。
The short-term and long-term de-velopment plans, drawn in the general terminal layout plan, are important basis for terminal constructions by stages. The general terminal layout plan of Guangzhou railway was drawn twice in the past, and it needs to be revised and complemented according to the development of current situation. For this reason, the paper discusses the development of the general layout plan of the Guangzhou terminal, such as the division of labour, and scale of marshalling yard and passenger and freight stations; and the cross untwining of sections and entering and departing lines. At the same time, the paper puts forward suggestions on improving the general layout plan of the terminal, so as to serve as references of the study on the general layout plans.
出处
《铁道运输与经济》
北大核心
1993年第5期17-20,37,共5页
Railway Transport and Economy
关键词
枢纽总图
编组站
客运站
货运站
Key Words: general terminal layout plan, marshallingyard, passenger station, freight station, crossuntwining of lines