摘要
重点介绍了坂雪岗污水处理厂的复合改良A2/O工艺的运行方式及除磷效果,并分析了实际运行中存在的问题及工程设计时的注意事项。
Introduction was given to the operating mode and phosphorus removal effect of the modified hybrid A^2/O process in Banxuegang Wastewater Treatment Plant.Analysis was made on the problems existing in actual operation and the points for attention in engineering design.
出处
《中国给水排水》
CAS
CSCD
北大核心
2004年第12期76-78,共3页
China Water & Wastewater
关键词
复合改良A^2/0工艺
除磷
运行方式
modified hybrid A^2/O process
phosphorus removal
operating mode