泵站经济运行中机组投入顺序的模糊优选 被引量:2

Fuzzy Optimization of Unit Turning-on Sequence in the Economic Operation of Pumping Station
在线阅读 下载PDF
导出
摘要 由于泵站机组的实际性能与设计值不一致 ,造成在泵站经济运行中对机组开机顺序的选择有一定的困难。采用基于模糊一致矩阵的决策方案优选方法对机组进行选优 ,使泵站的经济运行更符合实际 ,更有效降低泵站的运行能耗。 The disaccord between the designed and the actual performances of pumping station units can induce difficulties in the decision of unit turning-on sequence in the economic operation of pumping station. The decision schemes optimization method based on Fuzzy consistency matrix is adopted in the optimization of unit turning-on sequence to ensure that the economic operation of pumping station agrees with the actual performance to effectively reduce the operation energy consumption of pumping station.
出处 《中国农村水利水电》 北大核心 2004年第9期95-97,共3页 China Rural Water and Hydropower
关键词 泵站 经济运行 模糊优选 机组 pumping station economic operation fuzzy optimization unit
  • 相关文献

参考文献2

二级参考文献11

共引文献63

同被引文献27

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部