莱索托高原调水工程 被引量:5

Water Project in the Lesotho Highland
在线阅读 下载PDF
导出
摘要 由三坝一堰四洞组成的莱索托调水一期工程2004年3月竣工,年调水7.8亿m3。引水坝址平均调水比例73%。185 m高的Katse混凝土双曲拱坝为非洲最高坝,145 m高.Mohale坝为非洲最高的面板堆石坝。隧洞总长度119.6 km,最大埋深1 200 m,单洞最长45 km,全断面掘进机(TBM)施工。属跨国调水工程。 The Lesotho Highland Water Project is composed of 3 dams, one weir and four tunnels. It is completed in March, 2004. The mean ratio of diversion versus naturai annual inflows is 73%. The 185m high, double curvature concrete arch Katse Dam is the highest dam in Africa. Mo-hale Dam is the highest rock fill dam on the African Continent. The total length of the tunnels is 119. 6km, mostly excavated by TBM. the maxi-mum rock cover is l 200 m thick.
出处 《南水北调与水利科技》 CAS CSCD 2004年第4期53-56,共4页 South-to-North Water Transfers and Water Science & Technology
关键词 莱索托调水工程 设计与施工 TBM Lesotho Highland Water Project design and construction TBM
  • 相关文献

参考文献3

  • 1[1]Dr O T Blindheim, Lesotho Highlands Water Project, www.blindheirn. com/reference%20projects/Lesotho%20 Highlands 520 highlands%20water%20.
  • 2[2]www.lhwp.org.ls/engineering.
  • 3[3]www.reliefweb.int/w/rwb.nsf.

同被引文献44

引证文献5

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部