摘要 为缩短工期,提高工效,索风营水电站采用宽尾墩+台阶坝面+消力池的联合泄洪消能形式。通过三种不同比尺的模型试验,分析比较了枢纽布置、表孔泄流能力、宽尾墩、台阶坝面及下游消能防冲等问题,提出了X形宽尾墩,它具有传统宽尾墩大单宽泄洪消能作用,同时又有台阶坝面小流量消能作用,使消力池底板承受冲击压强减小30%。 The combined dissipator of flaring gate pier, stepped spillway and stilling basin is applied in Suofengying Hydropower Station in order to shorten the construction period. This paper analyzesseveral problems on structure arrangement, spillway discharge capacity, flaring gate pier, stepped spillway dam surface and energy dissipation. Then a X-shape of flaring gate pier is put forward. It can suit the large variable range of discharges and the jet flow pressure acting on the stilling basin can be reduced by 30%.
出处 《水力发电》 北大核心 2004年第5期14-17,共4页 Water Power
基金 西北农林科技大学青年基金资助项目("台阶过水面大单宽过流空化破坏与保护研究"部分内容)
关键词 泄洪 消能 宽尾墩 台阶溢流坝 索风营水电站 flood-releasing energy dissipation flaring gate pier stepped spillway dam Suofengying Hydropower Station
  • 相关文献

参考文献11

  • 1尹进步 南小红.乌江索风营水电站可研阶段水工水力学模型试验报告(左岸地面厂房方案)[R ].陕西杨凌:水利部西北水利科学研究所实验中心,2001..
  • 2韩立,邓毅国,杨键,欧阳松.大朝山水电站泄洪消能及排沙建筑物设计[J].水力发电,2001,27(12):30-32. 被引量:10
  • 3林可冀 韩立 邓毅国.大朝山水电站泄水建筑物初期运行情况[J].水利水电勘测设计,2003,(1):15-35.
  • 4吴持恭.水力学[M].北京:高等教育出版社,1982..
  • 5华东水利学院.水力学[M].北京:科学出版社,1985..
  • 6尹进步.乌江索风营水电站招标设计阶段水工水力学模型补充试验报告[R].陕西杨陵:水利部西北水利科学研究所实验中心,2003..
  • 7尹进步,刘韩生,梁宗祥.用于大单宽泄洪台阶坝面上的一种新型宽尾墩[J].西北水电,2002(1):44-46. 被引量:9
  • 8杨敏 等 见:栾力 苑润保.阶梯溢流面的几个水力学问题[A].见:栾力,苑润保.泄水工程与高速水流[C].长春:吉林科学技术出版社,1998..
  • 9刘韩生.乌江索风营水电站减压试验中间成果报告[R].陕西杨凌:水利部西北水利科学研究所实验中心,2002..
  • 10梁在潮 王道增.紊流挟气能力的研究.水利学报,1982,(2):24-31.

二级参考文献3

  • 1艾克明.台阶式泄槽溢洪道的应用状况浅析.泄水工程与高速水流[M].吉林科学技术出版社,2000..
  • 2杨敏 等.阶梯溢流面的几个水力学问题.泄水工程与高速水流[M].吉林科学技术出版社,1998..
  • 3水利部西北水利科学研究所试验中心.乌江洪家渡水电站1056泄洪洞事故检修门槽及工作门槽减压模型试验报告[M].,2001..

共引文献112

同被引文献59

引证文献8

二级引证文献58

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部