摘要
针对九龙山与楼德煤矿资源整合时期合并矿井存在的局部供风困难、主要通风机无法满足矿井实际需要以及内部角联分支稳定性较差的问题,对现有矿井通风系统进行了阻力测定并分析其阻力分布情况,据此提出矿井资源整合方案;利用计算机网络模拟软件对各方案进行网络模拟分析;通过经济、技术、稳定性3方面的比较,确定矿井资源整合最优方案。
There were some problems when Jiu longshan coalmine and Loude coalmine were merged for the integration of coal resources,such as the wind supply of partial location were difficulty,the main mine fan failed to meet the actual needs of the coalmine and the internal diagonal branch of ventilation network were instability. For the above problems,measures the resistance of the existing mine ventilation system,analyzes the distribution of resistance and proposed mine resource integration solutions. Simulates and analyzes the different proposals through the computer network simulation software. Determines the optimal solution of mine resources integration by comparing the economy,the technology and the stability of the different proposals.
出处
《煤炭技术》
CAS
北大核心
2015年第2期186-188,共3页
Coal Technology
关键词
资源整合
阻力测定
网络解算
方案优选
resource integration
resistance measurement
network solution
optimization