6Shenwei Zhang,Wenxing Zhou,Hao Qin.Inverse Gaussian process-based corrosion growth model for energy pipelines considering the sizing error in inspection data[J]. Corrosion Science . 2013
7Peter W. Tse,Xiaojuan Wang.Characterization of pipeline defect in guided-waves based inspection through matching pursuit with the optimized dictionary[J]. NDT and E International . 2012
8Hussein A.Asphaltene deposition in flow system. . 2003
9Cui Y,Lan H Q,Kang Z L,et al.Updated CO2/H2S internal corrosion model of natural gas pipelines based on flow field calculations. Corros.Eng.Sci.Technol . 2014
9Wilcox P, Lowe M J S, Cawley P. Long range Lambwave inspection: the efect of dispersion and modal se-lectivity[C]. Review of Progress in Quantitative NDE. New York: Plenum Press,1999: 151-158.
10Gunter S, Michael S, George F H, et al.Global Needs for Knowledge Dissemination, Research, and Development in Materials Deterioration and Corrosion Control[R].The World Corrosion, 2009.