突变式插板吊车梁计算过程中一些问题的探讨 被引量:2

DISCUSSION ON SOME QUESTIONS IN CALCULATION OF PLUG-IN CRANE BEAM WITH VARIABLE SECTIONS
原文传递
导出
摘要 炼钢车间、轧钢车间等工业厂房中经常要用到大吨位吊车,由于车间柱子及柱间支撑大多根据工艺要求布置,柱距分布很不规则,相邻柱距经常差别较大。而吊车往往都是全跨运行,为了便于厂房柱加工及安装,设计中尽量保持吊车肩梁顶面标高的统一。这样,就只能在吊车端部采取变截面、垫高等措施,变截面吊车梁就应运而生了。就突变式插板变截面吊车梁设计过程中遇到的一些问题进行探讨。 Strong crane is often used in some industrial workshops of steelmelting plant or steel rolling mill,but the column and column brace are fixed up for process design demand.Column spacing is very irregular and column spacing adjacent is often no difference at all.Cranes often move in all column spacings.In order to set up and process the column easily,usually the same elevating of crane beam's shoulder is kept in design.So,it is necessary for a variable section crane beam to be used,thus a variable section crane beam is produced.The article will discuss this question in crane beam design.
出处 《工业建筑》 CSCD 北大核心 2009年第S1期630-632,共3页 Industrial Construction
关键词 变截面 吊车梁 疲劳 variable section crane beam fatigue
  • 相关文献

参考文献1

共引文献1

同被引文献7

引证文献2

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部