摘要 限于目前技术水平,基坑降水很难计算准确,往往采用半理论半经验进行设计。非均质土层条件下基坑降水设计计算更是工程技术人员面临的一大难题。通过某新建电厂堆煤区地下传送廊道基坑降水设计工程实例,探讨非均质土层条件下基坑降水设计与施工。 It is well known that confined to present technology level,it is very hard to accurately calculate dewatering of foundation excavation and usually by half-theories and half-experience method.Design and calculation of dewatering in foundation excavation in non-homogenous soil is more difficult for engineers.In this article,the authors discuss this problem by an engineering example of dewatering design of foundation excavation on some underground transmission corridor.
出处 《施工技术》 CAS 北大核心 2009年第S2期67-68,共2页 Construction Technology
关键词 基坑 降水 非均质土层 设计 计算 施工 foundation excavation dewatering non-homogeneous soil design calculation construction
  • 相关文献

参考文献1

  • 1《基坑工程手册》编辑委员会[编],刘建航,侯学渊.基坑工程手册[M]中国建筑工业出版社,1997.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部