摘要 For a pipejacking, the jacking force is critical to balance the resistance force and to move the pipe string forwards. The driving mechanism of a curved pipejacking is more complicated than a straight-line pipejacking, and its jacking force is also more difficult to be determined. The paper theoretically studies the jacking force of a curved pipejacking by considering the static equilibrium of earth pressure, resistance at cutting face, friction at pipe surface, and the driving force behind the pipe string. The derived theoretical formula can be used to estimate the driving forces of a straight-line or a curved pipejacking. Case study was performed by applying the theoretical and empirical formulae. After calibration, the corrected formula is more accurate and more applicable. For a pipejacking, the jacking force is critical to balance the resistance force and to move the pipe string forwards. The driving mechanism of a curved pipejacking is more complicated than a straight-line pipejacking, and its jacking force is also more difficult to be determined. The paper theoretically studies the jacking force of a curved pipejacking by considering the static equilibrium of earth pressure, resistance at cutting face, friction at pipe surface, and the driving force behind the pipe string. The derived theoretical formula can be used to estimate the driving forces of a straight-line or a curved pipejacking. Case study was performed by applying the theoretical and empirical formulae. After calibration, the corrected formula is more accurate and more applicable.
出处 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2010年第4期298-304,共7页 岩石力学与岩土工程学报(英文版)
关键词 pipejacking curved pipejacking jacking force statics analysis pipejacking curved pipejacking jacking force statics analysis
  • 相关文献

参考文献8

  • 1魏纲,徐日庆,黄斌.长距离顶管管道的失稳分析[J].岩石力学与工程学报,2005,24(8):1427-1432. 被引量:29
  • 2Nanno T.A method for driving curved pipe-jacked tunnels. Tunnelling and Underground Space Technology . 1996
  • 3Chen C J.Physical modeling and jacking force analysis of curved pipejacking. . 2008
  • 4Japan Micro Tunneling Association (JMTA).Pipe-jacking application. . 2000
  • 5Shou K J,Yen J,Liu M.Frictional property of lubricants and its influence on pipejacking. Proceedings of the Sino-Japan No-dig Seminar . 2007
  • 6Osumi T.Calculating jacking forces for pipe jacking methods. No-Dig International Research conference . 2000
  • 7Staheli,K.Jacking force prediction:An interface friction approach based on pipe surface roughness. . 2006
  • 8W.Broere,,T.F.Faassen,,G.Arends,,A.F.van Tol.Modelling the boring of curves in(very) soft soils during microtunnelling. Tunnelling and Underground Space Technology . 2007

二级参考文献13

  • 1Teruhisa N. A method for driving curved pipe-jacked tunnels[J].Tunneling and Underground Space Technology, 1996, 11(2): 3 - 25.
  • 2Haslem R F. Pipe-jacking forces: from practice to theory[A]. In: Proc.ICE North Western Association Centenary Conference in Infrastructure Renovation and Waste Control[C]. Manchester:Manstock, 1986. 173.
  • 3O'Reilly M P, Rogers C D F. Pipe jacking forces[A]. In: Proceedings of an International Conference on Foundations and Tunnels[C].Edinburgh: Engineering Technics Press, 1987.201.
  • 4Norris P. The behaviour of jacked concrete pipes during site installation[Ph.D. Thesis][D].London: University of Oxford, 1992.
  • 5Milligan G W E, Norris P. Pipe-soil interaction during pipe jacking[J].Geotechnical Engineering, 1999, 137(1): 27 - 44.
  • 6候学渊 钱达仁 杨林德.软土工程施工新技术合肥[M].安徽科学技术出版社,1999..
  • 7伊易.长距离顶管管道失稳分析[J].建筑施工,1998,20(2):18-19. 被引量:7
  • 8王承德.曲线顶管初探[J].特种结构,1998,15(4):18-21. 被引量:16
  • 9brud,H,陈志斌.混凝土顶管管道的改进设计[J].岩土钻凿工程,2000(2):107-110. 被引量:3
  • 10徐日庆.考虑位移和时间的土压力计算方法[J].浙江大学学报(自然科学版),2000,34(4):370-375. 被引量:102

共引文献28

同被引文献81

引证文献11

二级引证文献49

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部