2GSA, DOD. NASA. Federal Acquisition Regulation [DB/OL]. USA:GSA,DOD and NASA,2005.
3R Hillman, G Swift, P Layton, et al. Space processor radiation mitigation and validation techniques for an 1800 MIPS processor board [A]. Proceedings of RADECS, 2003 [C]. USA: IEEE, 2003 : 347 - 352.
4Herbert J. Kramer. Observation of the Earth and Its Environment: Survey of Missions and Sensors [ M ]. New York: Springer- Verlag, 2002.1.
5C Barnes,M Sampson. Enabling COTS parts insertion in NASA systems[R]. NASA/NTRS, 2002.10.
6JPL-D-19426RC, Plastic encapsulated microcircuits reliability/usage guidelines for space applications[R]. NASA/JPL, California Institute of Technology,2005.5.
7MIL-STD-883G. Test method standard for microcircuits[S]. USA: DOD,2006.
8NASA/TP-2003-212244, PEM-INST-001 : instructions for plastic encapsulated microcircuit (PEM) selection, screening, and qualification[R]. USA: NASA,2003.