摘要
针对目前国内水利工程建设普遍存在的对项目前期的风险评估、项目后评价、运营综合管理重视不足等问题,本文结合世界银行和亚洲银行的全寿命周期评估决策程序,分析了项目后评价主要工作和基本原则,指出了建立水利工程项目后评价体系存在的问题。
Because of the ignorance to the prior period risk evaluation,post-project evaluation and total operating management existing commonly in Chinese hydraulic projects construction at present,the paper,combined with the total life-cycle assessment decision program of World Bank and Asian Bank,analyzes main work and basic principle of the post-project evaluation,and puts forward the problems of building hydraulic post-project evaluation system.
出处
《建筑经济》
北大核心
2007年第S1期128-130,共3页
Construction Economy
关键词
水利工程
全寿命周期
项目后评价体系
hydraulic project
life-cycle system
post-project evaluation system