海上承台双壁钢吊箱围堰设计与施工 被引量:11

Design and Construction of Double Wall Steel-Boxed Cofferdam for Offshore Pile Cap
在线阅读 下载PDF
导出
摘要 以大连长海县长山大桥为工程背景,介绍海上承台双壁钢吊箱围堰的设计和施工,双壁钢吊箱围堰同时作为承台防撞结构永久保留;对双壁钢吊箱围堰作为海上施工临时结构的构造特点、结构形式进行详细阐述,并对海上施工临时结构的设计荷载取值、设计控制工况进行分析,通过MIDAS Civil 2006建模整体计算设计结构构件,验算各工况下围堰各部分受力情况,整体介绍了双壁钢吊箱围堰海上拼装、整体吊挂下放的施工方法。 This paper takes the Changshan Bridge in Dalian as an example to introduce the design and construction of the offshore pile cap's double wall steel-boxed cofferdam which will be permanently reserved as the pile cap's anti-collision structure.Meanwhile,the paper elaborates the structure feature and structure type of the double wall steel-boxed cofferdam which is taken also as the temporary structure during offshore construction,and analyzes the design load value and control working-condition in design of offshore construction's temporary structure.By using MIDAS Civil 2006 for structure member modeling and entire calculating,the paper checks the stress situations of every part of the cofferdam under every working-condition.Moreover,some construction methods are introduced generally in this paper too,including the offshore assembly method and entire placement down by suspending and hanging method.
出处 《铁道标准设计》 北大核心 2012年第8期45-48,共4页 Railway Standard Design
关键词 海上承台 双壁钢吊箱围堰 设计 施工 offshore pile cap double-wall steel-boxed cofferdam design construction
  • 相关文献

参考文献6

二级参考文献16

共引文献38

同被引文献82

引证文献11

二级引证文献86

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部