7BUFFINGTON N, KELLNER J, KING J G, et al. Newtechnology in the bakken play increases the number ofstages in packer/sleeve completions [ R ] . SPE 133540,2010.
8YAKELEY S, WOOD E, KNEBEL M. Contacting thereservoir-beneflts of horizontal open-hole completions[R] . SPE 124074, 2009.
9GOODLOW K, HUIZENGA R. Multilateral completionsin the granite wash: Two case studies [ R ] . SPE 120478,2009.
10Sid Scott W. Packers designed for coiled tubing completions, recompletions, and stimulation [ C ]//SPE Rocky Mountain Petroleum Technology Conference, 21 - 23 May 2001, Keystone, Colorado. 2001.