摘要
Adopting a principle of “check_accept for the first rank,inspection for the second rank”,this paper briefly discusses the rationale of the sampling inspection and the sampling inspection schemes to digital products in GIS.The OC curve is drawn to explain the deficiency of the percent sampling inspection.Meanwhile,the method of One Time Limiting Quality of count selection is presented as the inspection scheme for production departments while the method of One Time After_inspection Mean Percent Defective Upper Limit of count selection is for acceptance departments.
:Adopting a principle of “check-accept for the f irst rank,inspection for the second rank”,this paper briefly discusses the rati onale of the sampling inspection and the sampling inspection schemes to digital products in GIS.The OC curve is drawn to explain the deficiency of the percent s ampling inspection.Meanwhile,the method of One Time Limiting Quality of count se lection is presented as the inspection scheme for production departments while t he method of One Time After-inspection Mean Percent Defective Upper Limit of cou nt selection is for acceptance departments.
基金
ProjectsupportedbytheNationalScienceFoundationofChina (No.49671 0 65)