寺则河隧道辅助坑道方案优化及施工情况探讨

EXPLORATION ON OPTIMIZATION OF ADIT SCHEME FOR SIZEHE TUNNEL AND ITS CO NSTRUCTION SITUATION
在线阅读 下载PDF
导出
摘要 施工前的方案优公是为了避免因设计原因给工程造成损失 ,同时也是神延线所有工程开工前的必做工作 ,寺则河隧道在工期短、围岩类别低、质量要求高、外资标单价低的情况下 ,施工前经过科学、合理地辅助坑道方案优化 ,使异常紧张的工期处于受控状态。笔者列出寺则河隧道辅助坑道优化的过程 ,以期能为类似工程施工提供参考。 The optimization of sheme before the construction is aimed at to avoid the losses in construction caused by design reasons.It was the necessory work which must be put forward before starting all engineering items for the Shenmu-Yan'an Railway.Before the construction of Sizehe Tunnel with th e situations of short construction period ,low class of surrounding rock, high q uality requirement and low unit bidding cost of foreign investments,a scientific and reasonable adit scheme was optimized so as to render the very intense const ruction period becoming an under-controlled situation.The procedures of the opt imization of the adit scheme for the Sizehe Tunnel are described in this paper,w hich may be provided as reference for constructing the similar engieering projec ts.
作者 崔振群
机构地区 中铁隧道工程局
出处 《铁道工程学报》 EI 2001年第3期89-91,88,共4页 Journal of Railway Engineering Society
关键词 寺则河隧道 辅助坑道 方案优化 施工情况 Sizehe Tunnel adit optmization of scheme scnst ruction situations
作者简介 崔振群 工程师 男 1970年出生
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部