期刊文献+

Key technical problems of extra-high concrete faced rock-fill dam 被引量:2

Key technical problems of extra-high concrete faced rock-fill dam
原文传递
导出
摘要 This paper summarizes the main technical points related to 100 m-height-scale concrete faced rock-fill dams and analyzes the main problems and their causes occurring during construction of 200 m-height-scale concrete faced rock-fill dams. This paper has raised the key technical problems which need to study for construction of 300 m-height-scale concrete faced rock-fill dams based on the main experiences on the extra-high concrete faced rock-fill dams built after the year of 2000. This paper summarizes the main technical points related to 100 m-height-scale concrete faced rock-fill dams and analyzes the main problems and their causes occurring during construction of 200 m-height-scale concrete faced rock-fill dams. This paper has raised the key technical problems which need to study for construction of 300 m-height-scale concrete faced rock-fill dams based on the main experiences on the extra-high concrete faced rock-fill dams built after the year of 2000.
出处 《Science China(Technological Sciences)》 SCIE EI CAS 2007年第z1期20-33,共14页 中国科学(技术科学英文版)
关键词 CONCRETE FACED rock-fill DAM extra-high DAM KEY TECHNOLOGY concrete faced rock-fill dam, extra-high dam, key technology
  • 相关文献

参考文献2

二级参考文献2

共引文献37

同被引文献18

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部