大跨度预应力渡槽静力分析 被引量:1

The Static Analysis of Big Span Pre-stressed Aqueduct
在线阅读 下载PDF
导出
摘要 沙河渡槽是我国南水北调中的重要工程,在设计中采用了跨度45 m的大型渡槽.为了给施工和设计提供参考,针对预应力钢筋混凝土能极大提高混凝土结构抗拉抗裂强度的特点,在优化配置预应力钢绞线的基础上运用有限元技术对渡槽的位移和应力进行了计算.计算结果表明,渡槽应力、变形满足设计要求,因此渡槽在静荷载作用下是安全的. Shahe aqueduct is an important project in the South-to-north Water Diversion project of our country,and it is designed by the big span aqueduct of 45 meters.For the sake of providing reference to the construction and design,according to the fact that pre-stressed reinforced concrete can greatly improve the tensile strength and rupture strength,and based on the optimical configuration of pre-stressed strand,the FEM is adopted to calculate the stress and displacement of the aqueduct.The results indicate that ...
出处 《华北水利水电学院学报》 2009年第2期24-27,共4页 North China Institute of Water Conservancy and Hydroelectric Power
关键词 渡槽 预应力 位移 静力分析 aqueduct pre-stress displacement static analysis
  • 相关文献

参考文献3

二级参考文献18

共引文献21

同被引文献10

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部