期刊文献+

改善高拱坝坝踵拉应力措施的探讨

Study on measures for improving tensile stress condition at heel of high arch dam
在线阅读 下载PDF
导出
摘要 目前改善高拱坝坝踵拉应力的措施,主要是坝体体型优化,以及设置诱导底缝。提出在拱坝上游地基内设置垂直缝的构想,重点分析了垂直缝设在不同高程范围和不同缝深对坝体应力和位移的影响。结果表明:设置垂直缝和诱导底缝都能够有效改善坝踵附近应力分布,对拱坝整体稳定影响较小。 Up to the present,the main measures for improving the tensile stress condition at the heel of high arch dam are by means of setting inducing bottom joints and optimizing the configuration of the dam.Now a tentative idea on setting vertical joints in the foundation under dam heel is suggested.The influences of vertical joints set at different elevations with different depths on the stress and displacement variation at dam heel are analyzed as focus.The resut shows that the vertical joints could effectively i...
出处 《湖北水力发电》 2009年第1期12-15,共4页 Hubei Water Power
关键词 小湾拱坝 垂直缝 诱导缝 应力 位移 Xiaowan Arch Dam vertical joints inducing joints stress displacement
  • 相关文献

参考文献6

二级参考文献21

  • 1卓家寿 姜弘道.带有夹层岩基的三维弹塑性分析[J].华东水利学报,1979,(2):1-22.
  • 2朱伯芳,响水拱坝裂缝成因及其处理咨询报告,1987年
  • 3朱伯芳,水土混凝土结构的温度应力与温度控制,1976年
  • 4Feng L M,J Struct Eng,1996年
  • 5潘家铮,第18届国际大坝会议技术报告,1995年
  • 6黎展眉,混凝土坝技术,1994年,1期
  • 7赫尔措格 M,高拱坝技术译文集,1992年
  • 8Zhang C H,Commun Appl Numer Methods,1989年,6期
  • 9Goodman R E,Taylor R L,Brekke T L.Model for the mechanics of joint rock[J].J of the Soil Mechanics and Foundations Division,1968,94(3):660~677.
  • 10Desai C S,Zaman M M,Lighther J G.Thin-layer element for interfaces and joints[J].Int J for Numerical and Analytical Methods in Geomechanics.1 984.8(1):19~43.

共引文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部