期刊文献+

秦山核电二期工程反应堆堆内构件模型流致振动试验研究 被引量:12

Experimental Study of Flow-induced Vibration of the Reactor Internal in Qinshan Phase II NPP Project
在线阅读 下载PDF
导出
摘要 秦山核电二期工程是我国自行设计的第一个600MW级核电站,有必要进行反应堆堆内构件流致振动试验研究。本文介绍了按相似准则设计的实堆1:5的堆内构件试验模型,进行流致振动试验采用的试验方法,完成的试验内容以及试验数据的分析和处理。测得了吊篮结构在冷却剂流动冲刷下的脉动压力和各种响应参数。试验结果可用于秦山核电二期工程安全评审,并提供了吊篮流致振动响应计算的载荷谱和实堆振动监测、故障诊断的参考样本。 Qinshan Phase Ⅱ NPP Project is the first 600MW PWR nuclear power plant designed by China. It is necessary to carry out the experimental study on the flow-induced vibration (FIV) of the reactor internal. This paper introduced the 1:5 experimental model, test method, test case, test data analysis and process. Fluctuating pressure force function that applies to the core barrel and a lot of response parameters of the internal structure were obtained. The result could be used in the safety evaluation for Qinshan Phase Ⅱ NPP Project.
出处 《核动力工程》 EI CAS CSCD 北大核心 2003年第z1期109-113,共5页 Nuclear Power Engineering
关键词 堆内构件 试验模型 流致振动试验 Reactor internals Test model FIV test
作者简介 喻丹萍(1970-),男,副研究员.1992年毕业于重庆大学工程力学系.现从事反应堆结构力学工作. 胡永陶(1943-),男,研究员.1966年毕业于西安交通大学应用力学专业.现从事反应堆结构力学工作.
  • 相关文献

同被引文献59

引证文献12

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部