随着大中城市中心城区土地开发水平和用电负荷密度进一步提高,各种市政设施更加密集,中心城区电力需求快速增长与土地供应不足日益成为制约电网发展的基本矛盾,如何减少变电站对土地的占用是破解中心城区电网建设困局的重要课题.本文主要结合深圳110 kV投控变电站嵌入式附建案例,从管理、技术等多方面进一步总结研究中心城区采用嵌入式附建变电站建设模式解决用电难题的路径方法.
With the further improvement of land development level and power load density in central and urban areas of large and medium-sized cities,various municipal facilities are more intensive.The rapid growth of power demand in the central city and the lack of land supply have become the basic contradictions restricting the development of power grids.How to reduce the substation The occupation of land is an important issue to break the dilemma of power grid construction in the central city.Based on this,this paper mainly combines the embedded construction case of Shenzhen 110 kV investment control substation,and further summarizes the path method of using the embedded auxiliary substation construction mode to solve the power problem in the central city from management and technology.