期刊文献+

基于模糊AHP评价的电力线路入廊规划全过程咨询模型 被引量:5

A Whole Process Consulting Model for Power Line Corridor Access Planning Based on Fuzzy AHP Evaluation
在线阅读 下载PDF
导出
摘要 目前,对于电力线路入廊规划问题尚未形成一个统一的咨询模型.提出了一种考虑模糊AHP评价与基于拓扑势优化的模型,作为电力线路入廊的全过程咨询模型.以安全性因素和互适性因素为评价指标,利用模糊AHP评价模型对协同规划方案进行评价,利用拓扑势熵最小原理对满足安全性要求的规划方案进行优化,得到最优化方案.最后通过算例验证了该咨询模型在电力线路入廊规划方案的评价与优化方面的有效性. As there is still no any unified consultation model for power line corridor access planning at present,this paper proposes a model for the whole-process consultation model based on fuzzy AHP evaluation and topological potential optimization.In the paper,safety and mutual adaptability factors are taken as evaluation indexes,the collaborative planning scheme is evaluated by using the fuzzy AHP evaluation model,and the optimal scheme is obtained by using the principle of minimum topological potential entropy to optimize the planning scheme which meets the safety requirements.Finally,an example is given to verify the effectiveness of the consultation model in the evaluation and optimization of power line access planning.
作者 董建达 宁康红 高强 卢家欢 裴传逊 任娇蓉 DONG Jianda;NING Kanghong;GAO Qiang;LU Jiahuan;PEI Chuanxun;REN Jiaorong(Ningbo Power Supply Company,State Grid Zhejiang Electric Power Co.,Ltd.,Ningbo 315010,Zhejiang,China;Zhejiang Electric Power Design Institute Co.,Ltd.,China Energy Engineering Group,Hangzhou 310012,Zhejiang,China;Taizhou Power Supply Company,State Grid Zhejiang Electric Power Co.,Ltd.,Taizhou 318000,Zhejiang,China)
出处 《电网与清洁能源》 2019年第2期38-43,共6页 Power System and Clean Energy
基金 国家电网公司科技项目(52110418000V)~~
关键词 综合管廊 模糊AHP 拓扑势 integrated pipe gallery fuzzy AHP topological potential
作者简介 董建达(1962—),男,本科,教高,研究方向为电网规划运行;宁康红(1977—),男,硕士,高工,研究方向为电力系统;高强(1985—),男,硕士,高工,研究方向为电网发展规划、调控运行;卢家欢(1993—),女,硕士,工程师,研究方向为电网规划;裴传逊(1980—),男,本科,高工,研究方向为电网规划;任娇蓉(1981—),女,硕士,高工,研究方向为电网规划计划。
  • 相关文献

参考文献12

二级参考文献112

共引文献412

同被引文献96

引证文献5

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部