期刊文献+

水电站工程特陡高边坡开挖施工监测技术分析 被引量:1

Analysis of Construction Monitoring Technology for Excavation of Ultra-steep High Slope in Hydropower Station Project
在线阅读 下载PDF
导出
摘要 大型水利水电设施建设过程中特陡高边坡的开挖和保护问题是水利工程施工中需要关注的一个重要方面.因此,为了验证设计和施工方式的合理性,保证良好的施工质量,需要对整个水电站工程特陡高边坡工程的开挖工作进行全面的规划设计,并提出相应的安全监测措施.文中通过对水电站工程的特陡高边坡开挖施工技术进行了探讨和分析,并给出了监测要点,研究成果为类似工程的施工监测工作提供参考. The excavation and protection of steep high slopes in the construction of large-scale water conservancy and hydropower facilities are an important aspect that needs attention in the construction of water conservancy projects.Therefore,in order to verify the rationality of the design and construction methods and ensure good construction quality,it is necessary to carry out a comprehensive planning and design for the excavation of the ultra-steep hish slope of the entire hydropower station project,and to put forward corresponding safety monitoring measures.This paper discusses and analyses the excavation construction technology of ultra-steep high slope of hydropower station project,and gives the monitoring points.The research results provide reference for the construction monitoring of similar projects.
作者 王平 WANG Ping
出处 《山西水利科技》 2019年第2期37-39,共3页 Shanxi Hydrotechnics
关键词 水电站 特陡高边坡 开挖施工 分析 hydropower station ultra-steep high slope excavation construction analysis
作者简介 王平(1982一),男,2012年毕业于新疆大学土木工程专业,工程师,长期从事水利水电工程建设及管理工作(水利监理)。
  • 相关文献

参考文献7

二级参考文献41

共引文献41

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部