本文基于成都地铁5号线九道堰车站机电安装项目,采用模型优化与现场施工相结合的方式,对运用BIM技术指导地铁机电安装过程进行了深入研究.通过碰撞检查来对管线模型进行优化设计;通过可视化施工模拟调整施工工序,对重难点技术提出优化方案并指导施工.
Based on the mechanical and electrical installation project of Jiudaoyan Station of Chengdu Metro Line 5,this paper conducts an in-depth study on the use of BIM technology to guide the mechanical and electrical installation of metro.This study adopts the method of model optimization and field construction.The pipeline model is optimized by collision inspection.Through the visualization construction simulation,the construction process is adjusted,and the optimization scheme is put forward to guide the construction.
作者
欧小聪
Ou Xiaocong(China Railway Construction Kunlun Subway Investment Construction Management Company,Chengdu Sichuan 610000,China)
出处
《铁道建筑技术》
2018年第A02期36-39,共4页
Railway Construction Technology
关键词
地铁车站机电安装
BIM技术
模型优化
现场施工
electrical and mechanical installation of subway stations
BIM technology
model optimization
site construction
作者简介
欧小聪(1982一),男,工程师,主要从事地铁站后机电安装工程的技术研究工作。