不稳定斜坡治理工程前期开展的内容及方案研究

Research on the Content and Scheme of Unstable Slope Treatment Engineering in the Early Stage
在线阅读 下载PDF
导出
摘要 不稳定边坡治理是地质灾害治理的主要项目之一。文章以贵州某县某小学不稳定斜坡应急治理工程为例,指出斜坡治理工程项目施工前期开展的内容包括工程勘查、斜坡稳定性分析计算、初步方案建议、主要工程设计与取值、经费估算、最终方案确定等。通过实例,论证了工程治理前期开展各项工作的科学性和合理性,对不稳定斜坡治理工作的开展有示范作用。 The treatment of unstable slopes is one of the main projects for the treatment of geological disasters.Taking the unstable slope emergency treatment project of a primary school in a certain county of Guizhou as an example,the article points out that the content of the slope treatment project in the early stage of construction includes engineering exploration,slope stability analysis and calculation,preliminary scheme suggestions,main engineering design and value selection,fund estimation,and final scheme determination.Through examples,the scientificity and rationality of various works carried out in the early stage of engineering treatment are demonstrated,which can serve as a demonstration for the development of unstable slope treatment work.
作者 余成浩 YU Cheng-hao(Guizhou Provincial Bureau of Non ferrous Metals and Nuclear Industry Geological Exploration,6th Corps,Kaili 556000,China)
出处 《世界有色金属》 2023年第5期232-234,共3页 World Nonferrous Metals
关键词 不稳定斜坡治理 前期工程 内容 方案 unstable slope treatment Preliminary engineering Content programme
作者简介 余成浩,男,生于1995年,苗族,贵州凯里人,本科,助理工程师,研究方向:水文、工程和环境地质。