核电大修项目计划管理系统优化分析

The optimization analysis of nuclear power overhaul project plan management system
在线阅读 下载PDF
导出
摘要 核电厂在利用信息化系统实现大修计划管理时,存在维修大纲条目数据质量差、项目变更效率低、大修进度无法跟踪的问题。针对现有系统的应用难点,设计了基于偏移量的大修历史数据校验算法、维修大纲条目智能校验算法,以确保数据库中数据的完整性、一致性、和正确性;提出了项目变更与大修项目清单自动关联功能,实现大修项目计划自动变更调整;提出一种项目进度反馈和展示方案,便于人员及时跟踪大修完成情况;最后,设计与国产化计划排程系统的集成方案,避免外国系统断供风险。该优化方案开发成本低,各项功能均符合核电厂相关管理要求,切实有效提高电厂管理水平,具有重大的推广意义。 Nuclear plants have some prickly subjects when utilizing the information system to manage the overhaul projects and plans,such as dirty data,low efficiency of updating planning,and inability to track overhaul progress.To optimize the existing system,a verification algorithm for overhaul historical data and an intelligent verification algorithm for maintenance outline items based on offset are designed in this paper to ensure the integrity,consistency and correctness of data in the database;The overhaul project lists are proposed to be associated with the change request forms automatically in the overhaul project plan management system;To track the overhaul process,a method that feedbacks the project progress timely is devised;And an integration scheme with domestic planning and scheduling system is designed to avoid the risk of supply failure of foreign systems.The optimizations are not only easy to be realized but also in line with the power plants’management requirements,which effectively improve the management level of power plants and have great promotion significance.
作者 胡敏 任宇阳 罗意 Hu Min;Ren Yuyang;Luo Yi(Institute of Nuclear Power Operations,Wuhan 430000,China)
出处 《电子技术应用》 2024年第S01期79-87,共9页 Application of Electronic Technique
关键词 核电机组 大修项目计划管理 nuclear power overhaul project plan management
作者简介 通信作者:胡敏(1996-),女,硕士,工程师,主要研究方向:核电信息化,Email:humin@cnnp.com.cn;任宇阳(1988-),男,硕士,高级工程师,主要研究方向:核电信息化;罗意(1989-),男,本科,工程师,主要研究方向:核电信息化。
  • 相关文献

参考文献4

二级参考文献3

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部