摘要
介绍了钢管混凝土束剪力墙结构体系在昆明某项目实施过程。包括项目审批及图纸审查流程,弹性分析、静力弹塑性分析以及动力弹塑性分析结果。同时,也介绍了为实现装配率要求所采取的措施,为类似装配式建筑的设计及实施提供参考。
The implementation process of concrete-filled steel tubular beam shear wall structure system in a project in Kunming was introduced. Including project approval and drawing review process, elastic analysis, static elastoplastic analysis and dynamic elastoplastic analysis results. At the same time, the measures taken to meet the requirements of assembly rate are also introduced, which provides a reference for the design and implementation of similar prefabricated buildings.