摘要
                
                    文中以西南水泥有限公司新建5000t/d吨熟料新型干法水泥生产线为例,分析了场地的工程地质特征与水文地质条件,对地下水的类型、补给和动态变化情况进行探讨,为边坡稳定性评价提供了技术支持。
                
                Taking the newly built 5000T/d clinker new dry cement production line of Southwest Cement Co.,Ltd.as an example,the engineering geological characteristics and hydrogeological conditions of the site were analyzed,and the types,recharge and dynamic changes of groundwater were discussed,so as to provide technical support for slope stability evaluation.
    
    
                作者
                    张绍诚
                Zhang Shaocheng(Yunnan General Team,China Geological Exploration Center for Building Materials Industry,Kunming,Yunnan 650000)
     
    
    
                出处
                
                    《江西建材》
                        
                        
                    
                        2022年第12期127-128,131,共3页
                    
                
                    Jiangxi Building Materials
     
    
                关键词
                    水文地质
                    边坡
                    勘查
                    稳定性评价
                
                        Hydrogeology
                        Slope
                        Exploration
                        Evaluation of stability
                
     
    
    
                作者简介
张绍诚(1988-),男,云南保山人,本科,工程师,主要研究方向为资源勘察、工程与水文地质等。