摘要
点支式玻璃幕墙是一种常见的建筑外墙系统,由大面积的玻璃板和金属构件组成。文中阐述了点支式玻璃幕墙工程施工的主要步骤,并结合工程实例,从施工准备、选择材料、测量放线、安装连接件、安装拉索和悬空杆、安装驳接系统、安装玻璃板块、打胶等方面探究点支式玻璃幕墙施工要点。
Point supported glass curtain wall is a common exterior wall system in buildings,consisting of large areas of glass panels and metal components.The article elaborates on the main steps of the construction of point supported glass curtain wall engineering,and combines engineering examples to explore the key points of point supported glass curtain wall construction from aspects such as construction preparation,material selection,measurement and setting out,installation of connectors,installation of cables and suspension rods,installation of connecting systems,installation of glass plates,and gluing,for reference by colleagues.
作者
陈涛
Chen Tao(Fujian Yucheng Group Co.Ltd.,Fuzhou,Fujian 350101)
出处
《江西建材》
2023年第6期292-293,296,共3页
Jiangxi Building Materials
关键词
点支式玻璃幕墙
测量放线
安装连接件
质量验收
Point supported glass curtain wall
Measurement and setting out
Install connectors
Quality acceptance