摘要
基于国家现行分时电价政策,结合某在建城市隧道实例重点分析负荷预测和储能电站选型,最终得出储能电站在该项目应用的经济性评估,为隧道运营节能降耗提供设计思路。
On the basis of the current national time-of-use tariff policy,and in consideration of the conditions of a city project under construction,this paper focuses on load forecast and the selection of energy storage power station,and finally makes economic evaluation of the application of energy storage power station in the works,so as to offer design ideas for energy saving and consumption reduction in tunnel operation.
作者
吴火军
WU Huojun(POWERCHINA Huadong Engineering Corporation Limited,Hangzhou 311122,China)
出处
《建筑电气》
2022年第11期33-39,共7页
Building Electricity
关键词
分时电价
储能电站
城市隧道
负荷预测
用电负荷
削峰填谷
经济性评估
节能降耗
time-of-use tariff
storage power station
urban tunnels
load forecast
electrical load
peak load shifting
economic evaluation
energy saving and consumption reduction
作者简介
吴火军,男,中国电建集团华东勘测设计研究院有限公司,高级工程师。