摘要
针对建筑群和建筑综合体共用消防给水系统设置问题,分别从系统所需扬程和设计流量、场地高差、项目分期、建筑形态、工程造价和运行管理等方面探讨影响共用消防给水系统设置的因素,并针对规范存在的不足,提出相关建议,优化共用消防给水系统设计。
Aiming at the problem of setting up fire water supply system for building group and building complex,The factors influencing the setting of the common fire water supply system are discussed from the aspects of the system required lift and design flow,site height difference,project staging,architectural form,project cost and operation management.And relevant suggestions are put forward to address the shortcomings of the specification.
作者
周逢源
王定城
赖江涛
赵丹
聂秋龙
吴文坚
ZHOU Fengyuan;WANG Dingcheng;LAI Jiangtao;ZHAO Dan;NIE Qiulong;WU Wenjian(Greenton Architecture Design Co.,Ltd.,Chongqing 401147,China;gad Architecture Design Co.,Ltd.,Hangzhou 310013,China)
出处
《给水排水》
CSCD
北大核心
2022年第S02期340-344,共5页
Water & Wastewater Engineering
关键词
共用消防给水系统
设计流量
工程造价
项目分期
场地高差
建筑形态
Common fire water supply system
Design flow
engineering cost
Project staging
Site height difference
Architectural form
作者简介
通信作者:赖江涛,男,1993年出生,重庆人,工程师。主要从事建筑给水排水设计及相关技术研究。通信处:重庆市渝北区星光大道90号土星商务中心A2座24F,401121 Email:844760802@qq.com