期刊文献+

森林覆盖率预测风险分析 被引量:1

Risk analysis on forest coverage prediction
原文传递
导出
摘要 选取降雨量、海拔、土层厚度、病虫害、造林工程、统计口径、森林地类认定标准、资源管理情况作为森林覆盖率预测风险分析的评价指标,采用层次分析法和多元回归模型得出:(1)影响森林覆盖率预测风险的评价指标中,统计口径权重值最大;(2)森林覆盖率预测风险系数区间为1.00到2.65。 Forest coverage is one of the important indicators that indicate the number of forests in a country or region.This paper selects rainfall,elevation,soil layer thickness,pests and diseases,afforestation projects,statistical caliber,forest land category identification standards,and resource management as the evaluation indicators for risk analysis of forest coverage prediction.The analytic hierarchy process and multiple regression model were used to draw the following conclusions:(1)among the evaluation indicators that affect the prediction risk of forest coverage,the weight value of statistical caliber was the largest;(2)the predicted risk coefficient range of forest coverage is 1.00 to 2.65.
作者 刘浪 LIU lang(Southwest Survey&Planning Institute of National Forestry and Grassland Administration,Kunming 650031)
出处 《林业建设》 2024年第1期22-26,共5页 Forestry Construction
关键词 森林覆盖率 评价指标 风险分析 层次分析法 多元回归模型 forest coverage evaluating indicator risk analysis analytic hierarchy process multiple regression model
作者简介 刘浪,男,硕士,工程师,主要从事森林资源调查、监测和规划工作。
  • 相关文献

参考文献6

二级参考文献24

  • 1叶绍明,张丽君.广西森林资源动态灰色数列预测[J].中南林业调查规划,1993(2):9-12. 被引量:2
  • 2高兆蔚.福建森林资源发展趋势的灰色预测[J].福建林学院学报,1990,10(1):15-22. 被引量:13
  • 3陈秀龙,陈磊夫,莫杏兴,陈秋波.海南省森林资源发展趋势的灰色预测[J].林业调查规划,2007,32(3):35-39. 被引量:5
  • 4国家林业局.“国家特别规定的灌木林”的规定[S].2004.
  • 5中华人民共和国林业部.国家森林资源连续清查主要技术规定[S].1994.
  • 6中华人民共和国林业部.森林资源规划设计调查主要技术规定[S].1996.
  • 7云南省林业厅.云南林业发展“十一五”和中长期规划[S].
  • 8云南省林业调查规划设计院,林业部中南林业调查规划设计院.云南省森林资源连续清查第二次复查统计报告[R].1993.
  • 9《中国林业工作手册》编篡委员会.中国林业工作手册[M].北京:中国林业出版社,2006.
  • 10国家林业局中南森林资源监测中心,云南省林业厅.云南省森林资源连续清查第四次复查成果[Z],2003.

共引文献22

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部