江南地区具有洪涝水位较高、水塘多、淤泥质土不均匀分布等特点,分析了风电场设计过程中施工期新建施工道路遇到水塘时的做法和改扩施工建道路需要注意的问题及解决办法;运营期检修道路的设计原则;水塘内的风机吊装平台在运营期拆除时应考虑风机基础的保护用地;以及风电场升压站布置过程中场平标高的确定;升压站内电缆沟排水等若干问题及解决方案。
The Jiangnan area is characterized by high flood level,many ponds,and uneven distribution of silty soil.This paper analyzes the wind farm design process what to do when a new construction road encounters a pond during the construction period,and the problems and solutions that need attention during the reconstruction and expansion of the road,and design principles for road maintenance during the operation period.When the fan hoisting platform in the pond is removed during the operation period,the protection land of the fan foundation,the determination of the field elevation during the layout of the booster station of the wind farm,several problems such as the drainage of the cable trench in the booster station and the suggested solutions should be considered.
作者
崔建秋
牛楠
康征
CUI Jianqiu;NIU Nan;KANG Zheng(North China Electric Power Design Institute Co.,Ltd.,China Power Engineering Consulting Group,Beijing 100120,China)
出处
《武汉大学学报(工学版)》
CAS
CSCD
北大核心
2021年第S01期40-42,共3页
Engineering Journal of Wuhan University
关键词
道路
水塘
升压站
防洪
road
pond
booster station
flood control
作者简介
崔建秋(1984-),女,高级工程师,主要从事电厂建筑设计工作,E-mail:cuijq@ncpe.com.cn.