轨道交通工程重叠段盾构施工技术研究 被引量:2

Study on shield construction technology in overlapping section of rail transit project
在线阅读 下载PDF
导出
摘要 本研究结合深圳市轨道交通4号线三期工程主体工程观澜湖站—牛湖站区间实体工程盾构法施工程序,通过工程重叠段盾构施工过程,从掘进前的预处理,到掘进过程严格控制,采取掘进多次监测等一系列过程控制,施工质量安全、进度整体可控。最终,顺利完成了重叠段的掘进施工,施工后对出入线影响较小,可为后续类似施工提供经验借鉴和参考。 This paper combines the shield method construction procedure of Guanlanhu station niuhu station interval entity project of phase III project of Shenzhen rail transit line 4,through the shield construction process of overlapping section of the project,from pre-treatment before excavation to strict control during excavation,and a series of process control such as frequent monitoring during excavation,the construction quality,safety and progress can be controlled as a whole.Finally,the excavation construction of the overlapping section is completed successfully,which has little impact on the access line after construction,and can provide experience and reference for the similar construction in the future.
作者 刘继红 Jihong Liu(China Railway Southern Investment Group Co.,Ltd.,Shenzhen 518055,China)
出处 《青海交通科技》 2020年第3期14-19,共6页 Qinghai Transportation Science and Technology
关键词 轨道交通 重叠段 盾构施工 rail transit overlapping section shield construction
作者简介 刘继红(1975-),男,工程师,主要研究方向:轨道交通工程。
  • 相关文献

参考文献9

二级参考文献48

共引文献86

同被引文献4

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部