摘要
医院机电系统复杂、安装精度高,尤其是走廊部分,对净空的高要求使得管线安装施工难度大。在工程实践中对走廊管线系统布局和综合支架进行优化设计,并利用BIM三维技术验证排布的可行性,实现了综合管线层次分明、科学经济的效果,供后续工程参考。
Hospital electromechanical system is complex and has high installation accuracy,especially in the corridor part.The high requirement for clearance makes pipeline installation and construction difficult.In engineering practice,the layout of corridor pipeline system and comprehensive support are optimized,and the feasibility of the layout is verified by BIM three-dimensional technology,which achieves the effect of comprehensive pipeline hierarchical,scientific and economic,for the reference of follow-up projects.
作者
胡志韩
李久安
张胜利
HU Zhihan;LI Jiuan;ZHANG Shengli(China Construction Seventh Engineering Division Co.,Ltd.,Zhengzhou,He’nan 450004,China)
出处
《施工技术》
CAS
2019年第S01期1498-1500,共3页
Construction Technology
关键词
医院建筑
机电安装
管线布置
综合支架
hospital buildings
mechanical and electrical installation
pipeline layout
integrated bracket
作者简介
胡志韩,工程师