摘要
对昆明医科大学第一附属医院5号楼基坑内支撑换撑工程做总结性研究,详细阐述该基坑地质条件和周边土体环境、基坑内支撑设计方案、换撑施工工艺流程以及监测措施等。该基坑内支撑换撑工程与地下室工程协调配合,保证基坑安全,保障施工质量,缩短工期。
In this paper,the author makes a summary study on the foundation excavation internal support replacement project of No.5 building of the First Affiliated Hospital of Kunming Medical University.The geological conditions of the foundation excavation,the surrounding soil environment,the design scheme of the foundation excavation internal support,the construction process of the support replacement and the monitoring measures are described in detail.The support replacement project in the foundation excavation is coordinated with the basement project to ensure the safety of the foundation excavation,guarantee the construction quality and shorten the construction period.
作者
吴勇
曾山
傅帝尹
杨正军
杨文海
WU Yong;ZENG Shan;FU Diyin;YANG Zhengjun;YANG Wenhai(Yunnan Construction Investment Third Construction Co.,Ltd.,Kunming,Yunnan 650000,China;Yunnan Metropolitan Investment Zhonghe Construction,Kunming,Yunnan 650216,China)
出处
《施工技术》
CAS
2020年第S01期117-120,共4页
Construction Technology
基金
住建部2019年科学技术计划(2019-S-120)
关键词
深基坑
支撑体系
力学稳定
地质
施工工艺
deep foundation excavation
support system
mechanical stability
geology
construction
作者简介
吴勇,高级工程师,E-mail:675218516@qq.com