高预制率装配式剪力墙结构高效吊装施工技术 被引量:6

High Efficiency Hoisting Construction Technology of Prefabricated Shear Wall Structure with High Prefabrication Rate
在线阅读 下载PDF
导出
摘要 预制构件的吊装是装配式结构施工的核心工序,直接影响到工程的质量、安全及进度。武汉纱帽八村还建工程主体结构施工采用预制装配式施工,装配率达55%。施工过程中充分发挥预制构件制作精度高的特点,在保证吊装质量和安全的前提下,通过施工组织与技术措施高效吊装。 The hoisting of prefabricated components is the core procedure of prefabricated structure construction,which directly affects the quality,safety and schedule of the project.The construction of the main structure of Wuhan Shamao eight Village also adopts prefabricated construction,with an assembly rate of 55%.During the construction process,the characteristics of high accuracy of prefabricated components are fully utilized.Under the premise of ensuring the quality and safety of the hoisting,the hoisting is performed efficiently through the construction organization and technical measures.
作者 吴吉 凡科 樊文波 WU Ji;FAN Ke;FAN Wenbo(China Construction Third Bureau Green Industry Investment Co.,Ltd.,Wuhan,Hubei 430100,China)
出处 《施工技术》 CAS 2020年第S01期1017-1020,共4页 Construction Technology
关键词 装配式 高效吊装 预制PCF板 叠合板 assembly efficient hoisting prefabricated PCF board laminated board
作者简介 吴吉,工程师,E-mail:1158909934@qq.com
  • 相关文献

参考文献1

二级参考文献13

共引文献10

同被引文献45

引证文献6

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部