大跨径叠合梁斜拉桥动载试验研究

Research on Load Test of Long Span Composite Beam Cable-stayed Bridge
在线阅读 下载PDF
导出
摘要 飞云江跨海特大桥为双塔双索面大跨径钢-混叠合梁斜拉桥,钢梁部分由纵梁、横梁、小纵梁共同组成钢梁格体系,桥面板采用分块预制、现浇湿接缝连接的方式,桥面板设置纵向、横向预应力钢束。全桥共有120根抗拉强度1770MPa平行钢丝斜拉索。约束体系采用半漂浮体系,在索塔设置了竖向支座及横向抗风支座,在辅助墩设置竖向支座,在过渡墩设置竖向支座。为了解新建桥梁结构在动荷载作用下的实际受力状况,评价其在设计使用荷载作用下的工作性能,获得桥梁结构的固有振动特性以及使用阶段的动力性能。对该桥进行了动荷载试验,试验结果表明:该桥的各测试点测试指标基本满足规范要求,承载能力满足设计荷载要求[1]。 The Feiyun River Cross-sea Super Bridge is a double-span double-span long-span steel-mixed composite cable-stayed bridge.The steel beam is composed of longitudinal beams,beams and small longitudinal beams,and the bridge deck is divided into blocks.For prefabricated,cast-in-place wet joints,the deck is provided with longitudinal and transverse prestressed steel bundles.There are 120 tensile steel cable stay cables with a tensile strength of 1770 MPa on the whole bridge.The restraint system adopts a semi-floating system,and a vertical support and a lateral wind-resistant support are arranged in the tower,a vertical support is arranged on the auxiliary pier,and a vertical support is arranged on the transition pier.In order to understand the actual stress state of the new bridge structure under dynamic load,the performance of the bridge under the design load is evaluated,and the natural vibration characteristics of the bridge structure and the dynamic performance of the use phase are obtained.The dynamic load test was carried out on the bridge.The test results show that the test indicators of the test points of the bridge basically meet the requirements of the specification,and the bearing capacity meets the design load requirements.
作者 常有斌 沈伟 CHANG Youbin;SHEN Wei(CCCC Road&Bridge East China Engineering Co.,Ltd.,Shanghai 201203,China)
出处 《施工技术》 CAS 2020年第S01期1250-1252,共3页 Construction Technology
关键词 桥梁工程 斜拉桥 动载试验 承载能力 bridges cable stayed bridges dynamic load test bearing capacity
作者简介 常有斌,工程师,E-mail:357931523@qq.com
  • 相关文献

参考文献4

二级参考文献25

  • 1丁南宏,林丽霞,孙迎秋,周世军.公路连拱桥在单车荷载下振动的理论和试验研究[J].兰州交通大学学报,2005,24(3):28-32. 被引量:15
  • 2GB/T7031-1986.车辆振动输入路面平度表示方法[S].[S].,..
  • 3JTGD60-2004.公路桥涵设计通用规范[S].[S].,..
  • 4JTJ023-1982,大跨径混凝土桥梁的试验方法[S].
  • 5KAWATANI M, KOMATSU S. Nonstationary random response of highway bridges under a series of moving vehicles[J]. Structural Engineering/Earthquake Engineering, 1988, 5 (2) : 285-292.
  • 6WANG T L, HUANG D Z. Cable stayed bridge vibration due to road surface roughness[J]. Journal of Structural Engineering, 1992, 118(5): 1354-1374.
  • 7CHATTERJEE P K, DATTA T K, SURANA C S. Vibration of continuous bridges under moving vehicles[J]. Journal of Sound and Vibration, 1994, 169(5): 619-632.
  • 8ZHENG D Y, CHEUNG Y K, AU F T K, et al. Vibration of multi span non uniform beams under moving loads by using modified beam vibration functions[J]. Journal of Sound and Vibration, 1998, 212(3): 455-467.
  • 9交通部第二公路勘察设计院.公路旧桥承载能力鉴定方法[Z],1988.
  • 10李小珍,张黎明,张洁.公路桥梁与车辆耦合振动研究现状与发展趋势[J].工程力学,2008,25(3):230-240. 被引量:101

共引文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部