期刊文献+

刚构-连续体系波形钢腹板PC箱梁桥合龙顺序研究 被引量:1

Study on Closure Sequence of Rigid-Continuous PC Box Girder Bridges with Corrugated Steel Webs
在线阅读 下载PDF
导出
摘要 以山西运宝黄河大桥副桥为研究对象,分别计算以桥跨刚度分布为原则的原设计合龙顺序和考虑施工阶段温度影响为原则的优化后合龙顺序对多跨刚构-连续组合体系波形钢腹板PC箱梁桥的内力影响,并进行了对比分析。提出该体系桥梁合龙顺序要考虑施工阶段温度的影响,可使波形钢腹板组合梁在施工阶段及运营状态下受力更均匀合理,对该类型桥梁在今后的的设计、施工具有一定的指导意义。 Taking the sub-bridge of Shanxi Yunbao Yellow River Bridge as the study object,the effects of original designed closure sequence based on the principle of the bridge span stiffness distribution and the optimized closure sequence considering the influence of temperature in construction stage on internal force of PC box girder bridge with corrugated steel webs in multiple span rigid-continuous composite system were calculated respectively,and the comparative analysis was carried out.In this system,the temperature in construction stage should be considered to determine the closure sequence,which can make the composite beam with corrugated steel webs bear more uniform and reasonable force during construction and operation and has certain guiding significance for the design and construction of this type of bridge in the future.
作者 王彬 WANG Bin(Shanxi Transportation Survey&Design Institute Co.,Ltd.,Taiyuan,Shanxi 030032,China)
出处 《山西交通科技》 2020年第3期83-86,123,共5页 Shanxi Science & Technology of Transportation
关键词 刚构-连续组合体系 波形钢腹板PC箱梁 合龙顺序 计算分析 rigid-continuous composite system PC box girder with corrugated steel webs closure sequence calculation and analysis
作者简介 王彬(1984—),男,山东郯城人,高级工程师,工学硕士,2011年毕业于重庆交通大学桥梁与隧道工程专业。
  • 相关文献

参考文献8

二级参考文献38

共引文献97

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部