榆林子隧道初期支护扭曲变形分析及工程对策 被引量:1

Analysis and Engineering Countermeasures of Twisted Deformation of Initial Support of Yulinzi Tunnel
在线阅读 下载PDF
导出
摘要 依托甘肃庆阳榆林子隧道,基于观测到的变形破坏问题,采用三维激光扫描技术对隧道进行追踪量测,发现初期支护存在左右沉降不一致的扭曲变形问题。因此开展榆林子隧道在三台阶七步开挖循环下的数值模拟,分析扭曲变形的发展过程、影响因素及相应特征,并提出左右支护差异化设计和调整开挖步序的处治方案,利用数值模拟方法验证其控制效果。结果表明:隧道整体扭曲偏向右侧,扭曲值呈先快速增加后逐渐稳定的趋势;隧道扭曲主要受含水率、开挖步序及支护措施的影响;左右支护差异化设计在长时间作用后可减小48.2%的扭曲变形,调整开挖步序仅减小8.5%的扭曲变形。 Relying on the Yulinzi Tunnel in Qingyang,Gansu,and based on the observed deformation and failure problems,this paper used 3D laser scanning technology to track and measure the tunnel,and it was found that there was a distortion problem of inconsistent settlement between the left and right sides.Therefore,the numerical simulation of Yulinzi Tunnel under the excavation cycle of Three-bench Seven-step Excavation was carried out,the development process,influencing factors and corresponding characteristics of distortion deformation were analyzed,and treatment plans for differential design of left and right supports and adjustment of excavation steps were proposed.Finally,use numerical simulation method to verify its control effect.Research indicates:The overall twist of the tunnel is inclined to the right,and the twist value increases rapidly at first and then gradually stabilizes;Tunnel distortion is mainly affected by water content,excavation sequence and support measures;The differentiated design of the left and right supports can reduce the distortion by 48.2%after long-term action,and only 8.5%of the distortion can be reduced by adjusting the excavation sequence.
作者 王思捷 蔚小英 屈晋斌 丁炜程 胡凯巽 伍毅敏 WANG Sijie;WEI Xiaoying;QU Jinbin;DING Weicheng;HU Kaixun;WU Yimin(Shanxi Road and Bridge Construction Group Co.,Ltd.,Taiyuan 030006;School of Civil Engineering,Central South University,Changsha 410075)
出处 《现代隧道技术》 CSCD 北大核心 2022年第S01期851-857,共7页 Modern Tunnelling Technology
基金 山西路桥建设集团有限公司课题
关键词 隧道工程 三维激光扫描 扭曲变形 数值模拟 变形控制 Tunnel engineering 3D laser scanning Distortion Numerical simulation Deformation control
作者简介 王思捷(1986-),男,工程师,主要从事公路隧道养护与管理方面的工作,E-mail:251385406@qq.com;通讯作者:丁炜程(2000-),男,硕士研究生,主要从事隧道脱空方面的研究,E-mail:2530661696@qq.com.
  • 相关文献

参考文献5

二级参考文献21

  • 1邓洪亮,陈凯江,朱明岩,邓启华.隧道监控量测三维激光扫描方法与应用研究[J].测绘通报,2012(S1):123-125. 被引量:22
  • 2霍润科,王艳波,宋战平,于钦源.黄土隧道初期支护性能分析[J].岩土力学,2009,30(S2):287-290. 被引量:30
  • 3毕俊,冯琰,顾星晔,林正庆.三维激光扫描技术在地铁隧道收敛变形监测中的应用研究[J].测绘科学,2008,33(S2):14-15. 被引量:73
  • 4张小红,刘经南.机载激光扫描测高数据滤波[J].测绘科学,2004,29(6):50-53. 被引量:103
  • 5BALTSAVIAS E P.A Comparison between Photogram-metry and Laser Scanning. ISPRS Journal of Photo-grammetry and Remote Sensing . 1999
  • 6DENG hongliang,FU xiaoyin,NI Tingting,et al.TheAdvanced Prediction and Emergency Management Tech-nique on Construction of Shallow Buried Large SectionBedding Rock Unsymmetrically Loaded Tunnel. Proceeding of The Eleventh International Symposium onStructural Engineering (ISSE-11) . 2010
  • 7DENG Hongliang,CHEN Kaijiang,DENG Qihua,et al.The Data Management System of Tunnel Monitoring. Proceeding of The 2012 International Conference onComputer-aided Material and Engineering (ICCME2012) . 2012
  • 8DENG Hongliang,DENG Qihua,CHEN Kaijiang,et al.3D Tunnel Clearance Measurement Technology and Ap-plication Based on Reverse Engineering. Proceed-ing of2012International Conference on Smart Technolo-gies for Materials and Communication (ICSTMC2012) . 2012
  • 9Wang Qingbo,Yuan Jingling,Zhong Luo.The Architecture of City Tunnel Monitoring Platform. The 2nd International Conference on Consumer Electronics,Communications and Networks in 2012 . 2012
  • 10Hong-liang Deng,Xiao-yin Fu.The Advanced Prediction and EmergencyManagement Technique on Construction of Shallow Buried Large SectionBedding Rock Unsymmetrical Loaded Tunnel. Proceedings of the EleventhInternational Symposium on Structural Engineering . 2010

共引文献70

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部