期刊文献+

作业时间依赖顺序的拆卸线平衡多目标优化 被引量:1

Multi-objective Optimization for Disassembly Line Balancing Problem with Sequence-dependent Part Removal Times
原文传递
导出
摘要 在废旧产品拆卸时无先后关系约束的任务之间可能存在拆卸干扰,使任务作业时间依赖于拆卸顺序,导致产品总作业时间不确定,从而影响拆卸线的平衡。为此,考虑拆卸过程中任务间的相互干扰,以最小化拆卸成本和环境危害为目标,构建作业时间依赖顺序的拆卸线平衡多目标优化模型,并提出一种Pareto人工蜂群算法进行求解,采用混合生成法保证种群质量与多样性,设计变邻域深度搜索策略以提高雇佣蜂局部开采效率,为降低侦察蜂探测的盲目性采用基于外部存档的单点变异算子进行搜索。最后通过算例与实例验证算法的有效性以及平衡任务在拆卸线上分配的重要性。 Remanufacturing is an effective way to realize the reutilization of resources.Disassembly plays a key role in remanufacturing since it allows for the selective separation of desired parts from the end-of-life(EOL)products.Disassembly line is the best choiceto deal with EOL products on a large scale,so it is essential that it be designed and balanced to work efficiently.However,in the disassembly process,some parts may interact with each other and their disassembly times will be incremented by additional operations,and this affects the balance of disassembly line.In order to solve the disassembly interference among parts,in this research a sequence-dependent disassembly line balancing problem is presented with two objectives including minimization of the disassembly cost and environmental hazards.Then,a Pareto artificial bee colony algorithm is proposed for addressing this multi-objective optimization problem.A mixed strategy is designed to build an initial population with high quality and diversity,and some improvements are made in local exploitation and global exploration to accelerate the search speed.Finally,aset of benchmark instances is used to test the performance of the proposed algorithm.Computational results evidently indicate the superior efficiency of the proposed algorithm.In addition,a case study is presented to illustrate that balancing the tasks among workstations can effectively avoid the tasks with more time increments being disassembled on priority.
作者 刘佳 王书伟 LIU Jia;WANG Shu-wei(Business School,Qingdao University of Technology,Qingdao 266520,China;College of Economics&Management,Shandong University of Science and Technology,Qingdao 266590,China)
出处 《中国管理科学》 CSSCI CSCD 北大核心 2021年第4期158-168,共11页 Chinese Journal of Management Science
基金 四川省教育厅自然科学一般项目(18ZB0587)
关键词 拆卸线平衡 顺序相依 人工蜂群算法 帕累托 disassembly line balancing problem sequence-dependent artificial bee colony Pareto
作者简介 通讯作者:王书伟(1985-),男(汉族),山东招远人,山东科技大学经济管理学院,副教授,博士,研究方向:多目标优化、智能算法,E-mail:skd996371@sdust.edu.cn.
  • 相关文献

参考文献5

二级参考文献38

  • 1吴卫星,杨宁,栾尧.突发事件时血液供应方式的探讨[J].中国输血杂志,2006,19(2):165-167. 被引量:46
  • 2GUNGOR A,GUPTA S M,POCHAMPALLY K,et al. Complications in disassembly line balancing [C]//Proceedings of SPIE. Bellingham, Wash. ,USA:SPIE,2001:289-298.
  • 3ALTEKIN F T, KANDILLER L, OZDEMIREL N E. Disassembly line balancing with limited supply and subassembly availability [C]//Proeeedings of SPIE. Bellingham, Wash. , USA: SPIE,2004 : 59-70.
  • 4AGRAWAL S, TIWARI M K. A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem[J].International Journal of Production Research, 2008,46(2) : 1405-1429.
  • 5MCGOVERN S M, GUPTA S M. 2-Opt heuristic for the disassembly line balancing problem[C]// Proceedings of SHE. Bellingham, Wash. , USA: SHE, 2004 : 71-84.
  • 6MCGOVERN S M, GUPTA S M. A balancing method and genetic algorithm for disassembly line balaneing[J]. European Journal of Operational Research,2007,179(3):692-708.
  • 7YAGMAHAN B, YENISEY M M. Ant colony optimization for multi-objective flow shop scheduling problem[J]. Computers and Industrial Engineering,2008,54(3):411-420.
  • 8GARCIA M C, CORDON O, HERRERA F. A taxonomy and an empirical analysis of multiple objective ant colony optimiza- tion algorithms for the bi-criteria TSP[J]. European Journal of Operational Research, 2007,180 ( 1 ) : 116-148.
  • 9DEB K, PRATAP A, AGARWAL S. A fast and elitist multiobjective genetic algorithm: NSGA-II [J]. IEEE Transactions on Evolutionary Computation,2002,6(2):182-197.
  • 10BLUM C, BAUTISTA J, PEREIRA J. Beam-ACO applied to assembly line balancing[C]//Proceedings of the 5th International Workshop-ANTS2006. Berlin, Germany:Springer-Verlag, 2006:96 107.

共引文献215

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部