In this paper, incised valley filling deposits, which formed an important pathway system for long-distance hydrocarbon migration, are discussed in detail based on core and logging data. The sequence SQy23 of the Creta...In this paper, incised valley filling deposits, which formed an important pathway system for long-distance hydrocarbon migration, are discussed in detail based on core and logging data. The sequence SQy23 of the Cretaceous Yaojia Formation is the main hydrocarbon-bearing layer in the Fulaerji Oilfield. The hydrocarbon source of the oilfield is the Qijia-Gulong Sag which is about 80 km away from the Fulaerji Oilfield. The transport layer of long-distance hydrocarbon migration is the overlapped sandstone complex which fills the incised valley. The incised valley developed during the depositional period from the late Qingshankou Formation to the early Yaojia Formation of Cretaceous (SQqna-SQy0 was about 70 km long and 20 km wide, and extended in the NW-SE direction. The overlapped filling of the incised valley mainly occurred in the expanding system tract of the third-order sequence SQy23 (ESTy23). Towards the basin, incised valley filling deposits overlapped on the delta developed in the early period, and towards the basin margin, incised valley filling deposits were covered by the shore-shallow lacustrine sandy beach bar developed in the maximum flooding period. All of the delta, the incised valley filling and the shore-shallow sandy beach bar are sandstone-rich, and have high porosity and permeability, and can form an effective hydrocarbon migration and accumulation system. Deltaic sand bodies collected and pumped hydrocarbon from the active source, incised valley filling depositional system completed the long-distance hydrocarbon migration, and lithological traps of shore-shallow lacustrine sandy beach bar accumulated hydrocarbon. The incised valley filling sequences are multi-cycle: an integrated shortterm filling cycle was developed on the erosion surface, and the sequences upward were mud-gravel stone, medium-fine sandstone containing terrigenous gravels and muddy pebbles with cross bedding, silty mudstone with ripple bedding, and mudstone. The incised valley filling deposits are characterized by a strong heterogeneity and the main hydrocarbon migration pathway is the medium-fine sandstone interval.展开更多
In order to safely exploit coal resource, protection coal pillars must be prepared in coal mines. Some correlative parameters of protection coal pillar are calculated by Drop face and Drop line methods. Models of prot...In order to safely exploit coal resource, protection coal pillars must be prepared in coal mines. Some correlative parameters of protection coal pillar are calculated by Drop face and Drop line methods. Models of protecting surface objects and coal pillars are established by TIN modeling and object-oriented technique. By using ACCESS2000as the database and the VC++ and OpenGL as the language, the calculation of protective coal pillars is realized and the 3D-visulizaiton system for protected objects on ground surface and for coal pillars is developed. The system can obtain the data of characteristic points on the surface interactively from the digitized mine topography map, constructing 3D model automatically. It can also obtain the interrelated parameters of the coal seam and drill hole data from existing geolog!cal surveying database to calculate the location, surface area and the total coal columns. The whole process can be computed quickly and accurately. And the 3D visualization system was applied in a mine, showing that the system solve the problem of complex calculation, not only realized the automatic 3D mapping and visualization of coal pillars for buildings protection, but also greatly improves the working efficiency.展开更多
Coal mine safety is a complex system, which is controlled by a number of interrelated factors and is difficult to estimate. This paper proposes an index system of safety assessment based on correlated factors involved...Coal mine safety is a complex system, which is controlled by a number of interrelated factors and is difficult to estimate. This paper proposes an index system of safety assessment based on correlated factors involved in coal mining and a comprehensive evaluation model that combines the advantages of the AHP and a grey clustering method to guarantee the accuracy and objectivity of weight coefficients. First, we confirmed the weight of every index using the AHP, then did a general safety assessment by means of a grey clustering method. This model analyses the status of mining safety both qualitatively and quantitatively. It keeps management and technical groups informed of the situation of the coal production line in real time, which aids in making correct decisions based on practical safety issues. A case study in the application of the model is presented. The results show that the method is applicable and realistic with regard to the core of a coal mine's safety management. Consequently, the safe production of a mine and the awareness of advanced safe production management is accelerated.展开更多
文摘In this paper, incised valley filling deposits, which formed an important pathway system for long-distance hydrocarbon migration, are discussed in detail based on core and logging data. The sequence SQy23 of the Cretaceous Yaojia Formation is the main hydrocarbon-bearing layer in the Fulaerji Oilfield. The hydrocarbon source of the oilfield is the Qijia-Gulong Sag which is about 80 km away from the Fulaerji Oilfield. The transport layer of long-distance hydrocarbon migration is the overlapped sandstone complex which fills the incised valley. The incised valley developed during the depositional period from the late Qingshankou Formation to the early Yaojia Formation of Cretaceous (SQqna-SQy0 was about 70 km long and 20 km wide, and extended in the NW-SE direction. The overlapped filling of the incised valley mainly occurred in the expanding system tract of the third-order sequence SQy23 (ESTy23). Towards the basin, incised valley filling deposits overlapped on the delta developed in the early period, and towards the basin margin, incised valley filling deposits were covered by the shore-shallow lacustrine sandy beach bar developed in the maximum flooding period. All of the delta, the incised valley filling and the shore-shallow sandy beach bar are sandstone-rich, and have high porosity and permeability, and can form an effective hydrocarbon migration and accumulation system. Deltaic sand bodies collected and pumped hydrocarbon from the active source, incised valley filling depositional system completed the long-distance hydrocarbon migration, and lithological traps of shore-shallow lacustrine sandy beach bar accumulated hydrocarbon. The incised valley filling sequences are multi-cycle: an integrated shortterm filling cycle was developed on the erosion surface, and the sequences upward were mud-gravel stone, medium-fine sandstone containing terrigenous gravels and muddy pebbles with cross bedding, silty mudstone with ripple bedding, and mudstone. The incised valley filling deposits are characterized by a strong heterogeneity and the main hydrocarbon migration pathway is the medium-fine sandstone interval.
基金Projects 59904001 supported by National Natural Science Foundation of China
文摘In order to safely exploit coal resource, protection coal pillars must be prepared in coal mines. Some correlative parameters of protection coal pillar are calculated by Drop face and Drop line methods. Models of protecting surface objects and coal pillars are established by TIN modeling and object-oriented technique. By using ACCESS2000as the database and the VC++ and OpenGL as the language, the calculation of protective coal pillars is realized and the 3D-visulizaiton system for protected objects on ground surface and for coal pillars is developed. The system can obtain the data of characteristic points on the surface interactively from the digitized mine topography map, constructing 3D model automatically. It can also obtain the interrelated parameters of the coal seam and drill hole data from existing geolog!cal surveying database to calculate the location, surface area and the total coal columns. The whole process can be computed quickly and accurately. And the 3D visualization system was applied in a mine, showing that the system solve the problem of complex calculation, not only realized the automatic 3D mapping and visualization of coal pillars for buildings protection, but also greatly improves the working efficiency.
文摘Coal mine safety is a complex system, which is controlled by a number of interrelated factors and is difficult to estimate. This paper proposes an index system of safety assessment based on correlated factors involved in coal mining and a comprehensive evaluation model that combines the advantages of the AHP and a grey clustering method to guarantee the accuracy and objectivity of weight coefficients. First, we confirmed the weight of every index using the AHP, then did a general safety assessment by means of a grey clustering method. This model analyses the status of mining safety both qualitatively and quantitatively. It keeps management and technical groups informed of the situation of the coal production line in real time, which aids in making correct decisions based on practical safety issues. A case study in the application of the model is presented. The results show that the method is applicable and realistic with regard to the core of a coal mine's safety management. Consequently, the safe production of a mine and the awareness of advanced safe production management is accelerated.